Skip to main content
This is the help library for Homeschool Trellis, a planner for one family's homeschool where every child gets their own login. Start your free 30 days See what Trellis does
Help / Run the Week From the Calendar
Run the day

Run the Week From the Calendar

Drag work onto days, put overdue work back into your schedule, shift work to other days or even out the weeks ahead, and see the plan in your phone's calendar.

The month calendar organizes color-coded work for several children and keeps unscheduled or month-only lessons ready to place.

Getting around

Scheduling by drag and drop

This is the heart of Trellis. Imported curriculum waits in the month view's side panel: Curriculum To Schedule for the current batch. All Unscheduled is for everything else, grouped by suggested month.

A lesson assigned to several children becomes each child's own copy. Moving or completing one never changes a sibling's copy.

Prefer not to drag for scheduling? On a computer, click any assignment card and use the drawer's Schedule on… box to pick a date directly. The dedicated phone calendar does not use that drawer: a scheduled card has Edit and Move. Edit opens the full assignment editor. Move opens a small dialog for choosing a date, moving it to Anytime This Month, or removing it from the schedule. An undated row under Anytime this month or Unscheduled opens the full editor when you tap it.

The assignment drawer

Click any assignment card to open it. From the drawer you can:

When the week goes sideways

Sick days happen. Two tools in the calendar toolbar put the plan back together:

Behind as of today and want overdue work dealt forward again? Use Catch Up.
Reshaping specific current or future days? Use Move Work.
  1. Catch Up puts overdue work back into your schedule. Pick a start date and how many weeks Trellis can use; everything unfinished from before that date gets a new day, beginning on that date. Each choice shows about how many assignments will land on a day. Review every new date before applying. After the date shown in the preview, your schedule is back to your plan.
  2. Move Work gives new dates to one day's unfinished work or to unfinished work on or after the date you choose, through the catch-up window. Choose the resume date and how fast to get back on track. Trellis places that work inside the window, and the preview shows when the schedule is back to the untouched original plan. Work after the window stays unchanged. Move Work can also even out the weeks ahead without pushing the plan. Completed work stays put, and nothing moves before you apply the preview.
  3. Use Catch Up for overdue work. Use Move Work when planned work needs different days or the weeks ahead need evening out.

More than assignments

See Trellis in your phone's calendar

Google, Apple, and Outlook calendars can show your Trellis plans: assignments, time off, and calendar notes. Trellis updates the feed as soon as your plans change; your calendar app chooses when to check it again. In Settings, the Calendar Feed card has two Copy buttons for the same read-only calendar. For Google, use the Copy button under Google Calendar; that link starts with https://. For Outlook or Apple, use the Copy button under Outlook or Apple Calendar; that link starts with webcal://. Outlook and Apple will not accept the Google link.

Keep both links in the family: anyone with either one can see your family's calendar. If one was ever shared somewhere it shouldn't be, click Regenerate Link on the same card. Both fresh versions start working and both old versions shut off everywhere they were subscribed.